How to earn money online in India - Quora

Overview

Tata Projects is a leading company providing comprehensive designing and construction solutions for setting-up, expansion, and modernisation of manufacturing facilities, railway fabrication facilities, defense, and industrial construction projects.


This division uses prefab construction, technology-driven construction, in-house design as key drivers in the quick execution of projects with the highest quality and safety standards. Few key projects include the ITC Panchkula food manufacturing facility , ICF Railway Coach Manufacturing Facility in Chennai, and E-Loco Facility at Madhepura (Bihar).


As the Indian government is increasingly focussing upon ‘Make in India’, there will be more need for modern industrial and manufacturing facilities nationwide. This requires leading companies such as Tata Projects Ltd to come forward towards modernising and augmenting India’s industrial and manufacturing capability to enable the nation to compete in the global arena.

Key Areas

How to earn money online in India - Quora

Industrial construction projects

Manufacturing sector construction

Manufacturing Facilities

Railway fabrication facilities

Railway fabrication facilities

Key Projects

Construction of Shed for LHB Shell and FIAT Bogie Manufacturing with allied facilities in the LHB Unit to upgrade production capacity ) alongwith associated Electrical Works and provision of M&Ps on turn key basis at ICF/Chennai-38

Construction of Sheds, Structures, Buildings, Water supply Arrangement, Drainage, Road, Power Supply Arrangement, General Electrical Works and Supply, Erection & Commissioning of Machinery & Plant in connection with setting up of FIAT Bogie Manufacturing Unit at Yadgir, Karnataka

Construction of Sheds, Structures, Buildings, Water supply Arrangement, Drainage, Road, Power Supply Arrangement, General Electrical Works and Supply, Erection & Commissioning of Machinery & Plant in connection with Augmentation of Production Capacity at Varnasi

Design & Build (EPC Contract) For Integrated Consumer Goods Manufacturing Facilities – Panchala, Howrah

Construction of Coke Oven, Blast Furnace , Raw Material Handling System for JSPL at Angul Project.

Augmentation of water system for SMS-II , Constrution of Air Seperation Units, Coke Oven Battery, Structural Mill, Chilled water plant for Rastriya Ispat Nigam Limited (Vizag) under varioues packages.

Civil and Strucurtal works for Tata Steel Kalinganagar Phase -I project

Civil works HSM-II, Wagon Unloading Silo Projects at Dolvi for JSW Steel Limited,

Augmentation of ICF's coach manufacturing capacity to 2750 coaches per annum, consisting of construction of sheds provisions of M&Pin the LHB/Shell/ Furnishing division, Furnishing division and associated Electrical works in turnkey basis.

Design Construction Supply Installation and Commissioning works for Setting up of Rolling Stock Component Factory at Lote ,Ratnagiri

Civil & Strucutral works for Valve Hall, Convertor Transformer, Firewall, Rail cum Road, Oil Collection system, Cooling and Ventilation Building, Service at Pugulur

Construction of Intermediate Low waste, Organic Low waste buildings including allied Mechanical & Electrical Works at INRPC, NRB, BARC, Tarapur.

Construction of building 302,306 & 307 and all allied structures including Civil, Electrical and Mechanical works for FRFCF at Kalpakam

Civil, Electrical, Air-Conditioning, Steel doors and Associated works for Augmentation of Solid Motor production Facilities (ASMP) Project at SDSC SHAR

Design, Engineering, Procurement, Manfacuring, Inspection, Testing, Supply of Sea Water System Piping & Equipments for KKNPP- 3&4 & KKNPP- 5&6

Construction of Main Plant Buildings, Structures and other associated works of Gorakhpur Haryana Anu Vidyut Pariyojana -1&2 at Gorakhpur Village, Fatehabad Distt., Haryana. (Plant Capacity – 2x700 MWe).

Civil, Structural & PH works for plant and Non - plant buildings (both RCC and Pre - Engineered Buildings) along with other allied structures for PFFF & ZFF facilities at Nuclear Fuel Complex - Kota Rawatbhatta, Rajasthan

How to earn money online in India - Quora

Design, Engineering, Procurement, Construciton, Completion, Testing and commissioning of New Electric Locomotive factory to produce 800 E-Locos in 11 years at Madepura, Bihar.

Integrated Consumer Goods Manufacturing & Logistics Facility for ITC, Panchal

Supply, Erection & Commissioning of Machinery & Plant in Connection with Augmentation of Production capacity 350 Crankcase/Anum (Part-II) at Diesel Locomotive workse works, DLW, Varnasi

Setting up of FIAT Bogie Manufacturing Unit at Yadgir, Karnataka.Erection & Commissioning of Machinery & Plant in Connection Setting up of FIAT Bogie Manufacturing Unit at Yadgir,Karnataka ,

LHB Shell and FIAT Bogie Manufacturing with allied facilities at ICF Chennai. Furnishing division & retro-fitment / reconditioning of M&Ps of shell division, on turnkey basis, for expanding stainless steel Coach Manufacturing Capacity at ICF Chennai

Augmentation of ICF's coach manufacturing capacity to 2750 coaches per annum, consisting of construction of sheds provisions of M&P in the LHB/Shell/Furnishing division, including resiting of M&Ps of Furnishing division and associated Electrical works in turnkey basis.

Construction of Civil Works and Allied Services for 800 KV & 6000 MW HVDC Rayagarah - Pugalur Terminal

Augmentation of ICF's coach manufacturing capacity to 2750 coaches per annum, consisting of construction of sheds provisions of M&P in the LHB/Shell/Furnishing division.

power

Power